Methodology

Visible assumptions, replaceable evidence.

The estimator begins with a dated installed-cost band by tank capacity or technology. It then adds difficult access, removal, permits, expansion control, venting, gas-line, electrical and relocation scope as separate visible allowances. No ZIP-code precision, fuel multiplier or urgency markup is invented.

How the model works

  1. Storage tanks use current installed bands for 30, 40, 50, 65, 75 and 80 gallons.
  2. Tankless and heat-pump products use their own installed technology bands.
  3. Property upgrades appear as separate line items and must not be added twice when already bundled.
  4. The estimator does not size equipment or certify an existing utility connection.
  5. Unsafe leaks, gas odors, carbon-monoxide alarms and electrical hazards are outside a browser estimate.

What the result means

The low and high values are planning bounds. The midpoint is simple arithmetic, not a prediction of the most likely contractor or carrier price. The calculator cannot inspect a property, verify a shipment, choose a legally suitable system, reserve capacity or issue a quotation.

Review date: 14 September 2026. We change a model only when the source, calculation and reason for the change can be recorded.

Current evidence snapshot

These current national observations bound a planning model. Installed bands and optional additions overlap when a contractor already bundles the work, so they must not be added twice or treated as a local quote.

Source register

Error corrections